Camp Arrowhead ADA Trail and
Bridge
Location: Camp Arrowhead
BSA, Ona West Virginia
February 2011 - Current
Project Description:
|
 |
This project is the second phase of ADA upgrade for Camp Arrowhead.
This portion of the project is for the construction of a 90 lf
laminated bridge to replace the old bridge and bring it up to ADA
standards. This project also included the construction of several
thousand feet of new trail that will also be ADA compliant and allow
for full access to the upper campsites for anyone with a disability.
-more- |
|
|
Beards
Mountain Trail Bridge
Bath
County, VA
November 2010 - January 2011
Project Description:
|
|
|
It is the reconstruction of a 220 foot cable
suspension bridge in the George Washington/Jefferson National Forest.
Construction included the replacement of all suspender cables, the
installation of bearing shoes, the replacement of all the cross
members, the replacement of 14 stringers, the replacement of
all handrail posts and members and the installation of 2x2
heavy wire mesh. It also included the replacement of one set
of steps and the reinforcement of the other set of steps with new a new
angle bracket.
-more-
|
|
Roaring Run Trail Bridge
Location: Botetourt County,
Virginia
August 2010 - November 2010
Project Description:
|
 |
This project was for the
replacement of a 60 foot long bridge located in the Roaring Run
Recreational Area. This bridge allows access to the Roaring
Run Iron Furnace and is on the loop trail for the Roaring Run Trail.
This project consisted of the construction of a new bridge
and the removal of the existing bridge.
-more- |
|
Camp Arrowhead ADA Trail and
Bridge
Location: Camp Arrowhead
BSA, Ona West Virginia
March 2009 - September 2009
Project Description:
|
 |
This project was for the
construction of an ADA
trail at
Camp Arrowhead. The project required a graded gravel trail
with timber
edging and no more than an 8% slope and the construction of
several puncheon bridges over drains as well as several large log cribs
and one 40 foot bridge. This trail allows access to a larger
area of
the camp to people with a disability. As well as access to
the
existing ADA fishing pier and ADA toilet.
-more- |
|
|
Long
Mountain Trail Bridge
Hardy
County , WV
September 2006 - November 2006
Project Description:
|
|
This Project was for the
construction of a
pre-fabricated steel bridge on the Long Mountain Trail. This
project was ADA compliant
-more-
|
|
Elizabeth Furnace Suspension
Bridge
June, 2005
Elizabeth Furnace, Virginia
Project Description:
|
 |
This
project is the construction of a 110 foot cable suspension bridge at
the Elizabeth Furnace Campground. The bridge is being built so that
people from the campground can access the picnic area across Passage
Creek.
-more- |
|
Laurel Run Trail Bridge
May, 2004
Greenbrier County, West Virginia
Project Description:
|
 |
This project consists of
the construction of a ......
-more- |
|
|
High Knob Trail Bridge
Location: Wise County, Virginia
May 2002
Project Description:
|
|
This
contract was for the construction of a 34LF sawn stringer timber bridge
with timber crib abutments. Due to the limited access of the bridge
site, most of the material was flown in by helicopter for the bridge.
The timber crib abutment material was hauled in by a mechanical mule
and some backpacking to the site. The old bridge that was being
replaced was demolished and removed from the site.
-more-
|
|
|
Wildwood Park Phase I
Location: Radford, Virginia
September 2001
Project Description:
|
|
Involved
the construction of a trail system for the City of Radford, VA in
Wildwood Park. The work included construction of treated timber
cribbing and waterbars as well as numerous round stock timber steps and
waterbars. The contract also included the construction of a 32LF sawn
timber stringer pedestrian bridge. For this bridge we used a alterain
crane to set the bridge. This was due to its closeness of the trail to
an access road in the middle of the park.
|
|
|
Apple Orchard Falls Trail Bridge
Location: Buchannon, Virginia
May 1999
Project Description:
|
|
Involved
the reconstruction and clearing and grubbing of existing trail as well
as relocations to improve gradients and the construction of treated
timber steps. The contract also included the construction of an 140 LF
elevated curvilinear screw laminated walkway beneath the falls. The
walkway consists of different levels with stairs in breaks on the
bridge. There is also a observation platform that was built attached to
the walkway with a bench for sitting.
-more- |
|
|
Cascades Recreation Area
Location: Pembroke, VA
May 1998
Project Description:
|
|
This
project involved clearing, grubbing, excavation, side hill trail
construction, removal of large hazard trees, timber cribbing, steps,
waterbars, and trail reconstruction to correct drainage problems. This
project also included helicopter operations and the construction of
four large treated timber bridges.
|
|
Stony Creek National Recreational
Trail
Location: Corder Branch, Virginia
Date:
Project Description:
|
|
This
project consisted of the construction of a 127LF three span glu-lam
bridge delivered by helicopter. We received a SBA Directors Award of
Excellence for this project.
|
|
|
Meadow Creek Trail Bridge
Location: Allegheny Trail, West Virginia
Date:
Project Description:
|
|
This
project included the construction of a 90LF prefab steel bridge on the
Allegheny Trail in the Monongahela National Forest in West Virginia.
|
|
|
Jackson River Suspension Bridge
Location: Hidden Valley, Virginia
Date:
Project Descripiton:
|
|
This
contract was for the construction of a 150LF, Cable Suspension Bridge,
over the Jackson River in Virginia. The project is located in the
George Washington National Forest at the recreation area known as
Hidden Valley.
|
|
|
Cripple Creek Bridge
Location: Mount Rogers National Recreation Area, Virginia
Date:
Project Description:
|
|
This
project involved the setting of a 94LF prefab steel bridge at Raven
Cliff, in the Mount Rogers National Recreation Area in Virginia
|